Course overview
About this course
A practical programme for planners and project controllers who prepare, schedule, monitor and close out shutdown and turnaround projects in Oil & Gas and Petrochemical plants. It follows the full turnaround planning lifecycle in Primavera P6, under client standards and best practices.
Planning engineer tools and skills
- Primavera P6 (Advanced User)
- Microsoft Excel (Advanced)
- Power BI / Dashboards
- Risk Analysis (Monte Carlo)
- Delay Analysis Techniques
- Earned Value Management
- Data Analytics & Reporting
- Communication & Coordination
- Problem Solving & Decision Making
Course outcomes
- Understand shutdown & turnaround planning lifecycle
- Develop integrated & resource loaded schedules in P6
- Apply industry standards & best practices
- Monitor progress & control project performance
- Perform risk & delay analysis
- Generate management reports & dashboards
- Enhance coordination & decision making
- Add value as a professional planning engineer
Who should attend
- Planning Engineers / Project Planners
- Schedulers / Project Controllers
- Construction Managers
- Maintenance Managers
- Project Managers
- Cost Engineers
- Anyone involved in shutdown & turnaround planning
End-to-end shutdown and turnaround planning process flow
The eleven steps every module in the course supports, from setting the strategy to the post-turnaround review.
- 1Strategy & Scope
- 2Work Identification
- 3WBS Development
- 4Activity Planning
- 5Resource Planning
- 6Duration Estimating
- 7Cost Loading
- 8Risk Analysis
- 9Schedule Baseline
- 10Execute & Monitor
- 11Review & Closeout
Complete end-to-end course content
Fifteen modules, each with the client standards and procedures it follows.
Foundations: Strategy, Scope and Work Identification
Introduction
- Overview of Shutdown & Turnaround (S&T)
- Types of Turnarounds (Minor, Major, Critical)
- Objectives & Success Criteria
- S&T Lifecycle & Key Phases
- Challenges & Best Practices
Standards: Aramco, SABIC, ADNOC, PDO
Shutdown Strategy & Planning
- Shutdown Strategy Development
- Scope Definition & Objective Setting
- Risk Assessment & Mitigation Planning
- Shutdown Budgeting & Cost Control
- Stakeholder Identification & Governance
Standards: SAEP-331, SAEP-14, SAEP-12, Aramco GI-02.710, GI-20.520, PDO PIMS
Scope Definition & Work Identification
- Equipment Identification & Tagging
- Work Identification (Inspection, Repair, Replace)
- Work Packaging & Job Plan Development
- Backlog Management
- Scope Changes & Impact Assessment
Standards: Aramco EPM Manual, SABIC PEM, ADNOC PES, PDO PIMS
Building the Schedule: WBS, Activities, Durations, Resources and Calendars
Work Breakdown Structure (WBS)
- Develop Turnaround Specific WBS
- Levels of WBS (L1 to L5)
- Align with Equipment & Systems
- Integrate with Cost & Resources
Standards: SAEP-14, Aramco WBS Guide, SABIC WBS Standard, ADNOC WBS, PDO PIMS
Activity Planning & Sequencing
- Activity Identification & Definition
- Logical Relationships (FS, SS, FF, SF)
- Lead / Lag & Constraints
- Critical Activities Identification
- Integration with Other Disciplines
Standards: SAEP-12, P6 Best Practices
Duration Estimating
- Duration Estimating Techniques
- Use of Historical Data
- Productivity & Crew Productivity Rates
- Factors Affecting Durations
- Uncertainty & Contingency
Standards: Aramco Productivity Library, SABIC Rates, ADNOC Guidelines, PDO PIMS
Resource Planning
- Resource Types (Labor, Equipment, Material)
- Resource Loading in P6
- Resource Calendars & Shifts
- Crew Composition & Productivity
- Resource Levelling & Smoothing
Standards: Aramco Manpower Standards, SABIC Resource Standards, ADNOC, PDO
Calendar Management
- Global, Resource & Project Calendars
- Shift Patterns (Days, Nights, Rotations)
- Non-Working Days & Exceptions
- Calendar Alignment with Site Conditions
Standards: Aramco Calendar Standard, SABIC, ADNOC, PDO
Cost, Progress, Risk and Delay
Cost Loading & Integration
- Cost Codes & Cost Accounts
- Cost Loading in P6
- Budget at Completion (BAC)
- Earned Value Management (EVM)
- Cost Performance Monitoring
Standards: Aramco Cost & Scheduling Manual, SABIC PEM, ADNOC, PDO
Progress Measurement & Monitoring
- Progress Measurement Systems (Weightage)
- Physical Progress vs Plan
- Daily, Weekly, Monthly Updates
- Documenting Actuals in P6
- KPIs: SPI, CPI, TCPI
Standards: Aramco PMS, SABIC, ADNOC, PDO PIMS
Risk Management & Schedule Risk Analysis
- Risk Identification & Assessment
- Qualitative & Quantitative Risk Analysis
- Monte Carlo Simulation in P6
- Risk Register & Mitigation Plans
- What-If Scenario Analysis
Standards: SAEP-331, Aramco Risk Management Manual, SABIC, ADNOC, PDO
Delay Analysis
- Delay Types (Excusable, Compensable)
- Time Impact Analysis (TIA)
- As-Planned vs As-Built
- Windows Analysis
- Collapsed As-Built
Standards: Aramco Claims Procedure, SAEP-331, SABIC, ADNOC, PDO
Reporting, Integrated Master Schedule and Closeout
Reporting & Communication
- Standard Reports in P6
- S-Curves, Histograms, Cash Flow
- Look-Ahead Schedules (3W / 6W / 12W)
- Executive Dashboards
- Highlight Reports & Exception Reports
Standards: Aramco Reporting Standards, SABIC, ADNOC, PDO
Integrated Master Schedule (IMS)
- Development of IMS in P6
- Integration of All Disciplines
- Level 1 to Level 5 Schedule Structure
- Interface Management
- Schedule Quality Checks (DCMA 14 Point)
Standards: SAEP-331, SAEP-14, Aramco IMS Requirements, SABIC, ADNOC, PDO
Closeout & Lessons Learned
- Post-Turnaround Review
- Performance Evaluation
- Lessons Learned Documentation
- Final Reports & Handover
- Continuous Improvement
Standards: Aramco, SABIC, ADNOC, PDO Best Practices
Role of a planning engineer in shutdown and turnaround projects
Role of a planning engineer
- Develop integrated turnaround schedule in P6
- Define activities, logic, resources & durations
- Ensure alignment with scope, budget & resources
- Perform schedule risk & what-if analysis
- Monitor progress & forecast completion
- Identify constraints & propose solutions
- Support planning of critical activities
- Prepare look-ahead schedules
- Maintain schedule baselines & revisions
- Ensure compliance with client standards
- Facilitate meetings & communicate updates
- Support cost & resource optimization
- Prepare delay analysis & recovery plans
- Ensure data integrity in P6
- Provide decision support to management
Key responsibilities
- Develop & maintain integrated shutdown schedule
- Perform schedule review & risk analysis
- Ensure logic, resources & durations are accurate
- Monitor daily progress & update schedule
- Prepare recovery & re-sequencing plans
- Track critical path & float consumption
- Prepare dashboards & KPI reports
- Support HSE, quality & compliance planning
- Coordinate with all disciplines & contractors
- Ensure data accuracy & quality in P6
- Manage changes & maintain schedule integrity
- Perform delay analysis (TIA, Windows, As-Built)
- Support claims & extensions of time (EOT)
- Provide management with decision support
Practical exercises and course features
Hands-on practical exercises
- Create a shutdown project from scratch in P6
- Develop WBS & activities for a turnaround
- Assign relationships, leads / lags & constraints
- Load resources & level the schedule
- Create & manage calendars & shifts
- Cost load the schedule & generate S-Curves
- Update progress and measure performance
- Perform what-if & risk analysis (Monte Carlo)
- Conduct delay analysis (TIA & Windows)
- Prepare reports, dashboards & look-ahead schedules
Course features
- Industry aligned standards
- Practical & hands on
- Real time case studies
- Templates & checklists
- Expert tips & best practices
- Career enhancement
- EPC / EPCC focus
Client standards and documents covered
The same planning steps, applied under the requirements of each client.
Saudi Aramco
- SAEP-331
- SAEP-12
- SAEP-14
- SAEP-21
- GI-02.710, GI-20.520
- Cost & Scheduling Manual
- EPM Manual
- PMS Manual
SABIC
- SABIC PEM (Project Execution Model)
- SAES-H-006
- Project Controls Manual
ADNOC
- PES (Project Execution System)
- Schedule & Cost Control Procedures
PDO
- PIMS (Project Integrated Management System)
- PDO-90 Cost Control
- Project Controls Guidelines
Standards and references you will work with
Turnaround planning follows client procedures, supported by international good-practice standards, inspection codes that drive the scope, and Indian statutory requirements. The course teaches how to apply them together.
International standards and practices
PMI, AACE, DCMA, SCL, API, ISO- PMI PMBOK Guide / Practice Standard for SchedulingProject management and scheduling good practice
- AACE RP 37R-06Schedule levels of detail for EPC projects
- AACE RP 57R-09Integrated cost and schedule risk analysis using Monte Carlo simulation
- AACE RP 29R-03 / RP 52R-06Forensic schedule analysis, prospective time impact analysis
- ANSI / EIA-748Earned value management systems
- DCMA 14-Point AssessmentSchedule quality checks
- SCL Delay and Disruption ProtocolGuidance on delay analysis and claims
- ISO 31000Risk management guidelines
- ISO 21500 / ISO 21502Guidance on project management
- API 510 / 570 / 653In-service inspection requirements that drive turnaround scope
- ISO 45001 / ISO 9001Occupational health and safety, quality management
BIS and Indian references
Standards, statutes and safety bodies- IS 15883Construction project management guidelines
- Factories Act, 1948Safe working, confined spaces and pressure plant during shutdowns
- Indian Boiler Regulations (IBR)Statutory boiler inspection and certification windows
- SMPV(U) Rules 2016 / PESOStatutory inspection of pressure vessels
- OISD standardsOil Industry Safety Directorate guidelines, including work permit and shutdown safety
- Contract Labour (Regulation and Abolition) Act, 1970Contractor manpower requirements for shutdown crews
- Indian Contract Act, 1872Contracts, extension of time and damages
Client and industry procedures
Aramco, SABIC, ADNOC, PDO- Saudi AramcoSAEP scheduling, cost and project execution procedures
- SABICProject Execution Model (PEM) and project controls manual
- ADNOCProject Execution System (PES) and schedule and cost control procedures
- PDOProject Integrated Management System (PIMS) and project controls guidelines
- Client turnaround proceduresShutdown readiness, work scope freeze and permit requirements
- Client and project specificationsAlways override and extend the general standards
The procedure and edition that apply depend on the contract and client. Participants are trained to confirm the governing document before preparing a schedule.
Course content at a glance
Tap the image to open it full size.
Add value as a professional turnaround planning engineer
Develop integrated, resource-loaded schedules in Primavera P6, control progress and risk, and support decisions from shutdown strategy to closeout.
Hands-on: build a shutdown schedule from scratch in Primavera P6.